News & Events
![](https://pbiengineering.com/wp-content/uploads/2023/02/1Petersen-BrustadSORTING02.15.2023-1-scaled-e1677274553287-1030x773.jpg)
Helping Out
PBI has taken on the initiative to try and give back to the…
![](https://pbiengineering.com/wp-content/uploads/2020/10/City-of-Roseville-50-e1603216011164.png)
City of Roseville On-Call Engineering Services
The City of Roseville
selected PBI from the…
![](https://pbiengineering.com/wp-content/uploads/2020/09/Vista-Meter.jpg)
Cal Am Fruitridge Vista Meter Installation Program
PBI developed a four-year phasing plan to install over 3,000
customers…
![](https://pbiengineering.com/wp-content/uploads/2020/09/COS-Pump-Outfalls-1030x773.jpg)
City of Sacramento Pump Outfall Replacement
PBI will prepare contract documents for the design of City
of…
![](https://pbiengineering.com/wp-content/uploads/2020/09/Arden-Wells.jpg)
Cal Am Arden Wells Design
PBI provided design and permitting services to develop two
new…
![](https://pbiengineering.com/wp-content/uploads/2020/09/Transmission-Main.png)
Fair Oaks Water District Transmission Main Condition Assessment
PBI was retained by Fair Oaks Water District to assess
the condition…
![](https://pbiengineering.com/wp-content/uploads/2020/09/IMG_20200826_090918-1030x579.jpg)
Sacramento Suburban Water District Operations Plans and Tank Retrofits
PBI will prepare Operations Plans for two of the District’s…
![](https://pbiengineering.com/wp-content/uploads/2020/09/City-of-Folsom-Logo.png)
City of Folsom Recycled Water Master Plan (RWMP)
PBI was retained by the City of Folsom to update the 2015 Non-Potable…
![](https://pbiengineering.com/wp-content/uploads/2020/08/Business-Growth-Image-1.jpg)
PBI has grown
PBI is happy to announce we have grown. In 2020, we have added…
![](https://pbiengineering.com/wp-content/uploads/2020/08/Part-107.png)
PBI Does Drone Aerial Imaging (July 31, 2020)
PBI
is happy to announce that staff engineer,…