City of Sacramento Pump Outfall Replacement

PBI will prepare contract documents for the design of City of Sacramento’s Pump Outfall Replacement Project. The project entails the complete replacement of the pump discharge for three (3) drainage sump station facilities and partial replacement of the pump discharge pipe for five (5) drainage sump station facilities as well as condition assessment at six (6) drainage sump station facilities which penetrate various levee systems. The complete replacements include positive valve closures and associated structures as required by the U.S. Army Corps of Engineers and the Central Valley Flood Protection Board.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~