Historic District Utilities Rehabilitation
Folsom, CA
Overview
Project Summary
Designed 1,100 LF of 8-inch sewer line and 6,200 LF of 8-inch water line. Existing water lines were abandoned. Existing sewer line was replaced in-kind. Prepared specifications and bid documents, an engineer’s cost estimate, and attended review meetings with the City. Provided construction management for the project.