PBI creates Dam Emergency Action Plans (EAP)

With the State of California mandating that many of the dams in the State have emergency action plans (EAP), PBI is now bringing our background in emergency flood plan development to dams. We are excited to work with Madera Irrigation District to create the EAP as well as inundation maps for Madera Lake Dam.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

PBI does Dam Breach Modeling & Inundation Mapping

PBI is now bringing its extensive 2D hydraulic modeling expertise to dam breach analyses. With the State of California mandating that many of the dams in the State have inundation maps, PBI is now developing the models necessary to simulate catastrophic dam failures. We are excited to work with Tuolumne Utility District to create inundation maps for Phoenix Dam near Sonora, CA.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Lincoln Oaks Oakberry Well Reactivation

California American Water has selected PBI to reactivate and update the Oakberry Well within the Lincoln Oaks community. PBI will be leading the design and management of this project which will provide safe, clean drinking water for the local community. PBI has worked with California American Water on several projects over the last decade and are excited to continue working closely with them to provide excellent engineering services.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

USACE On Call Contract

In partnership with CYS Structural Engineers, Inc., PBI has been awarded an on-call contract with the United States Army Corp of Engineers, Sacramento Division. Over the next 5 years, PBI will assist with hydraulic, hydrologic and other civil engineering tasks as needed.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Yuba County Gold Village Drought Resilience Project

PBI was awarded the Gold Village Drought Resilience Project by Yuba County. The project includes performing a groundwater feasibility study and the design and construction of a 255,000-gallon potable water storage tank. This project will provide short-term drought relief along with long-term water supply sustainability for the Gold Village community.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

City of Folsom Fire Flow Analysis

PBI was awarded an on-call fire flow analysis support contract with the City of Folsom. The project includes providing hydraulic fire flow modeling analysis to ensure required water pressure and flow to each fire hydrant in the City of Folsom’s water system.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

CCWD Jenny Lind / Copper Cove Master Plans

PBI has been awarded the Water System Master Plan Update project for the Jenny Lind and Copper Cove water treatment plants by the Calaveras County Water District.  The project includes using hydraulic modeling to locate deficiencies in the existing water supply system and predicting the future needs of the system.  A list of proposed projects will be developed from the hydraulic study to help Calaveras County Water District meet current and future demands.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Colusa County Floodplain Mapping Services

PBI has been awarded the Floodplain Mapping Service project by Colusa County. PBI will provide technical guidance and support to the County as they progress through FEMA floodplain certification and remapping of the region.  This includes participating in FEMA’s LAMP process, reviewing existing H&H information provided by FEMA and conducting an independent H&H study to verify the results developed by FEMA.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Alta WTP Towle Canal Intake

PBI has been awarded the second phase of the Alta Water Treatment Plant Towle Canal Intake project by the Placer County Water Agency. The project includes the design and coordination of the construction of a new intake pump and pipe system.  This project will control the intake of the facility and ensure the water quality of the Alta Water Treatment Plant.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Upper Lake Small Community Feasibility Study

PBI, along with Kjeldsen, Sinnock and Neudeck, Inc. and Kim Floyd Communications, has been awarded the Flood Control Project Feasibility Study for the Upper Lake and Middle Creek regions. The project includes civil, hydraulic and hydrologic modeling, cost estimating and economic services to determine the feasibility of future flood control projects.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Isleton Pipeline Abandonment Project for California American Water

Peterson Brustad Inc. has been awarded a contract to relocate California American Water Company’s Isleton water pipeline determiend by the US Army Corps of Engineers to be within the levee prism. PBI will provide project management, design, bidding, and construction services for the project.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

PBI Awarded Contract for California American Water’s 2015 Well Rehabilitation Master Plan Update

PBI has been awarded California American Water Company’s 2015 Well Rehabilitation Master Plan Update. PBI will meet with operations staff to ascertain recurring problems, system deficiencies, and determine the need for future well cleaning and improvements. A standardized checklist will be developed to verify and record functionality and age of critical equipment at each well site during above grade condition assessment visits. A 6-year Capital Improvements Plan will prioritize infrastructure improvements throughout Cal Am’s Sacramento area well system.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

City of Folsom Water Master Plan

Peterson Brustad, Inc. has teamed with Tully and Young to prepare the City of Folsom’s 2015 Water Master Plan. PBI will review, update, and calibrate the City’s existing InfoWater hydraulic model, then analyze the City’s distribution system throughout the planning period. A 10-Year Capital Improvement program will recommend annually scheduled improvements based on priority.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Foresthill PUD 1MG Tank Project

Foresthill Public Utilities district selected PBI to provide project management, siting, and design for a new 1 million gallon tank at the Foresthill water treatemnt plant.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DWR commits $44 million towards the Feather West Levee Project

Sutter Butte Flood Control Agency’s Feather West Levee Project reduces flood risk by providing 200-year protection to urban areas including Yuba City, and 100-year protection to non-urban areas protected by the levees. DWR’s commitment to provide another $44 million enables SBFCA to construct the critical northern project segment.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Larkfield Pipeline Improvements Project

California American Water Company selected Peterson Brustad, Inc. to provide design and construction management services for their Larkfield Pipeline Improvements Project.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Moonbeam Well Storm Drain Improvements

PBI has been selected by California American water to provide design and construction management support for their Moonbeam Well Storm Drain Improvements Project.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

American River Pump Station Improvements

PBI has been selected by PCWA to provide construction management services for their American River Pump Station Improvements Project.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Three new projects for City of Folsom

PBI recently began three new projects for the City of Folsom: Crestridge Lane Water Main Replacement Project, LaCollina Del Lago Pump Station Hydro Tank Replacement, and Reservoir no. 1 Improvements Project.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Latest Project Win – ULDC for Cities of Lathrop & Manteca

Our latest project win is a joint contract with the Cities of Lathrop and Manteca for services related to the Urban Levee Design Criteria Analysis and Identification of Deficiencies  for the RD 17 Levees.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~